THE IMPACT OF STRANDED INVESTMENTS
Coal-fired power generation in much of the world in the very near future will be a stranded investment, but we also have to start thinking about gas-fired power being stranded…
Coal-fired power generation in much of the world in the very near future will be a stranded investment, but we also have to start thinking about gas-fired power being stranded…
Asunim Turkey connects 24MWp licensed systems for Akfen Renewable Energy. After major references in industrial solar rooftop and utility scale PV systems and the successful commissioning of two previous licensed…
With the 10.9MWp System presented here, Asunim Turkey has now completed the second licensed Solar Power Plant. Another two licenses are currently still under construction and scheduled for connection in…
Coal-fired power generation in much of the world in the very near future will be a stranded investment, but we also have to start thinking about gas-fired power being stranded…
After a successful implementation of Akfen’s first 8MWn licensed system in Elazığ in 2016 and after recently signing another 9MWn license with YBT Enerji, Asunim is very proud to add…
The systems will generate approximately 16,800 MWh per year and is one of the few licensed systems that will be grid connected in 2018. Asunim Turkey is a highly active…
Asunim Group established its EPC and O&M operations in Turkey in 2012 and has a successful track record of many projects implemented since then. Since last month, the company is…
https://www.reuters.com/article/brief-jinkosolar-supplies-42mw-of-solar-idUSFWN1HX0EQ